Unibridge Rail Solutions
UNIBRIDGE® Rail Solutions have been conceived for temporary railway applications, where a railway bridge needs to be installed very rapidly to replace either a damaged bridge (accident or earth tremor) or an existing bridge under repair or heavy maintenance.
- A UNIBRIDGE® Rail bridge can reach up to 22m clear span with two 1.25m deep girders side by side to accommodate one set of rail per bridge, while meeting most current rail load specifications in Australia and New Zealand.
- Each UNIBRIDGE® Rail module consists of two fabricated box girders of 11.4m length with one single connection, fully painted and ready for assembly with spacers, nuts and bolts, connecting pins and anchorage pads. The standard kit also includes two lateral pedestrian side walks recommended for safety reasons.
- No additional welding or machining is required on site during the assembly of a UNIBRIDGE® Rail bridge.
- The installation of UNIBRIDGE® Rail on pre-built abutments adapted to the geo-physical requirements of the site will only take a few days or sometimes hours, if access to the site allows the use of a heavy mobile crane.
- UNIBRIDGE® Rail Solutions can be moved easily to another location. They are a permanent asset to the company and can be used time and time again – they are never obsolete.